Current Weather @ 2:40 PM Clear skies Temp 51.1º Humidity 30% Winds SSW 5.0mph Max Gust 24.2mph
Todays Extremes High 53.4º Low 22.7º Rain 0.00" Rain Rate 0.000" per hr Snow 0.00" Season 23"
LATEST ALERTS (whats this?)

(Click alert for more info)
Welcome
Username:

Password:


Remember me

[ ]
[ ]
ROADS AND TRAFFIC
Updated: 02:30 PM v2.1
Big Bear to Highland (330): 138 mins  
Highland to Big Bear (330): 120 mins  
Big Bear to Mentone   (38): 75 mins  
Mentone to Big Bear   (38): 80 mins  
Big Bear to Lucerne    (18): 35 mins  
Lucerne to Big Bear    (18): 36 mins  
=Light  =Moderate  =Heavy Traffic
Road Conditions Page: Click Here
Online
Guests: 385, Members: 11 ...
onur6boss
Tlingit
Gorn
Metcalf Man
Geezer
WoolyBear
MrOwl
Quakes
IDKnothin
mtnlinda
N42754

most ever online: 1532
(Members: 36, Guests: 1496) on Jul 06 : 02:54pm

Members: 5239
Newest member: Gorn
SUPPORT SCM!
Support SCM by making a single or recurring donation.

Member's Birthdays:
Happy Birthday to:

Birthday Cake
MB in BB


Upcoming Birthdays:
Jan 21 Dale
Jan 21 heyjude
Jan 22 Bubba
Jan 22 squeakyval
Jan 23 MyCon
Jan 24 grizzly
Forums
Socalmountains.com :: Forums :: ROAD CONDITIONS
<< Previous thread | Next thread >>   

PAVING AND ADA WORK ON SR-38 FROM MENTONE TO FOREST FALLS WITH LANE CLOSURES BEGINNING AUGUST 20!

Author Post
***SCM ALERT***
Thu Aug 02 2018, 05:05PM Email Thread Print View

Automated Alert Robot

Joined: Wed Dec 26 2007, 08:50PM
:
Posts: 2873
SAN BERNARDINO – The California Department of Transportation (Caltrans) is beginning a project to mill and overlay current pavement and improve American Disabilities Act (ADA) ramps on State Route 38 (SR-38) between Agate Street in Mentone to Valley of the Falls Drive, Forest Falls (post mile 15). The $4.9 million project, which was awarded to All American Asphalt, began on August 1, 2018, with the contractor mobilizing equipment and placing signage. Lane reductions will start on August 20, 2018. The project is expected to be completed in late 2018.

During the project there will be lane closures with flagging operations, as needed. One lane will remain open in each direction during work hours. Motorists may expect delays due to one-way traffic control and occasional, short-term, moving lane closures between the hours of 5:00 a.m. and 4:00 p.m. Monday through Friday. Flagging operations are expected to begin on Monday, August 20, 2018. For work from August 1 to 24, 2018:

Both On State Route 38 (SR-38) from Agate Street, Mentone to Falls Drive, Forest Falls (PM 15)
August 1 to 3, 2018 5:00 a.m. to 4:00 p.m. No lane closures. Mobilization of equipment and sign placements

Both On SR-38 from Agate Street, Mentone to Falls Drive, Forest Falls August 6 to 17, 2018
5:00 a.m. to 4:00 p.m. No lane closures. Shoulder only closed for ADA upgrade work.

North and Southbound On SR-38 from Amethyst St. to Forest Falls (PM 15) August 20 to 24, 2018
5:00 a.m. to 4:00 p.m. Flagging Operation: 1 lane closed for paving preparation and work

Please be aware of the work and SLOW FOR THE CONE ZONE. Know before you go! To stay on
top of roadwork in the Inland Empire go to [Click Here] and sign up for commuter alerts.
View traffic conditions at [Click Here].

==============
SCM Automated Alerts
Follow the Latest Incidents:
Twitter: @bigbearscanner / Facebook: Socalmountains
Back to top

Moderators: Craig (KJ6BCM), ©ammy, Lumbe® Jill, Mtn.goat John, Debbie Doodah, ***SCM ALERT***, Benny (N6BWX), Socalmountains Admin, ***WX ALERT***

Jump:     Back to top

Powered by e107 Forum System
Chatbox
You must be logged in to post comments on this site - please either log in or if you are not registered click here to signup


Quakes
Jan 20 : 02:39pm
I will be watching the sky tonight! However, I'm bothered to see it suddenly clouding up outside. I hope that these pass before tonight.

MrOwl
Jan 20 : 02:39pm
Super Wolf Blood Moon

MrOwl
Jan 20 : 02:38pm
Super Blood Wolf Moon...unfortunately we will probably be too cloudy here(Idaho) to view it

N42754
Jan 20 : 02:32pm
Lunar Eclipse Tonight:

Here is the timeline for Sunday, Jan. 20, Pacific Time:

• Partial umbral eclipse begins at 7:34 p.m.

• Total lunar eclipse begins at 8:41 p.m.

• Greatest eclipse is at 9:12 p.m.

• Total lunar eclipse ends at 9:43 p.m.

Gorn
Jan 20 : 02:22pm
Mtn Girl, I'm on the east side of Boulder Bay and had the same experience. I finally just turned the breaker off because the power going on and off so often isn't good for computers and the fridge and such. It came back on at 4am here.

I don't know the cause and was hoping to find it here on SoCalMountains.

IDKnothin
Jan 20 : 02:17pm

MrOwl
Jan 20 : 02:16pm
ouch!

IDKnothin
Jan 20 : 02:16pm
Let me add to that. It’s 60 minutes just from Arrowbear to Running Springs (Blondies to Jensen’s Market)

***SCM ALERT***
Jan 20 : 02:00pm
SCM Traffic Alert! Big Bear to Highland via 18/330 (Downbound) is experiencing 30+ minute delays.

***SCM ALERT***
Jan 20 : 01:54pm
SEARCH AND RESCUE - SBD PEAK TRAIL - AIR RESCUE 06 HOSTING INJURED HIKER AND DOG FROM THE 9000 FT LEVEL

***SCM ALERT***
Jan 20 : 01:41pm
TYPE: TRAFFIC ACCIDENT AREA: RUNNING SPRINGS 320XX HILLTOP BLVD - RSP X HILLTOP BLVD E/HUNSAKER WAY UNITS: MA50 S51 E271 BC2805
More Info: Click Here
Live Scanner: Click Here

***SCM ALERT***
Jan 20 : 01:10pm
SEARCH AND RESCUE BEING DISPATCHED TO AN INJURED HIKER - SEVERAL MILES IN ON THE SBD PEAK TRAIL [Click Here]

***SCM ALERT***
Jan 20 : 01:09pm
Im going to Lucerne.... The only way out!!

***SCM ALERT***
Jan 20 : 01:07pm
Apparently they are on to Hwy 38 also! 45 minute delay there! [Click Here]

***SCM ALERT***
Jan 20 : 01:06pm
Thanks for chiming in TruBluDad! Big Bear is a mess also. I think it is a solid line from the Big Bear Village to Highland.



(C)2002-2018 Socalmountains.com
All Rights Reserved
Privacy Policy Terms of Service
Contact Us

{THEMEDISCLAIMER}